Division Street will be milled and repaved on September 10th and 11th. The work will be at night between 7p-7a and Division will be down to one lane during construction.
Division Street will be milled and repaved on September 10th and 11th. The work will be at night between 7p-7a and Division will be down to one lane during construction.